Exfo IQS-12004B DWDM Passive Component Test System for Instrukcja Użytkownika Strona 173

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 172
Using the Power Meter Linearity Verification Tool
DWDM Passive Component Test System 161
Verifying Linearity on a Specific Channel
To verify linearity on a specific channel:
1. Ensure that the acquisition parameters are properly set. For more
information, see Setting Up the Acquisition Parameters on page 158.
2. If necessary, select the channel number from which you want the
verification to start, using the up/down arrows next to the Channels:
box from the DUT panel.
Note: You don’t have to specify a channel for the reference power meter since
channel 1 always acts as the reference channel.
IMPORTANT
Starting a new acquisition (on a new channel) will remove all
previous data from memory and will overwrite the previous results
file.
To prevent unwanted data loss, specify a new results filename and
save your report file before starting a new acquisition.
Entry zone
Browse button
DUT and reference power meter
information block
Channel to
verify
Automatic report
printing after test
Start
button
Save report
Przeglądanie stron 172
1 2 ... 168 169 170 171 172 173 174 175 176 177 178 ... 436 437

Komentarze do niniejszej Instrukcji

Brak uwag