Exfo PPM-350C PON Power Meter Instrukcja Użytkownika Strona 23

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 22
PPM-350C 17
To test in Pass/Fail or Normal mode:
1. Inspect your fibers and clean them properly if needed (see Cleaning and
Connecting Optical Fibers on page 11 for details).
2. Connect as shown:
3. Tur n unit on.
4. If you want to test in Pass/Fail mode:
Ensure that LEDs are on. If not, press .
Ensure that the desired threshold set is selected (see Selecting a Threshold
Set on page 14).
Results are now available.
Test at the premises
Tes t j u m p e r
ONT port
Tes t jum p e r
OLT/video port
Drop cable
Bulkhead connector
Test at the drop terminal
Tes t jum p e r
ONT port
Tes t j u m p e r
OLT/video port
Bulkhead connector
Drop cable
ONT port
Tes t j u m p e r
OLT/video port
Splitter’s output pigtail
Bulkhead connector
Te s t ju m pe r
Test at the fiber distribution hub (FDH)
P/F
mode
Przeglądanie stron 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 46 47

Komentarze do niniejszej Instrukcji

Brak uwag